Skip to content
Guide

Reading the Control Tower: a guide for new users.

What each panel means and how to go from exception to decision in three clicks.

By Roufaida Bouchamha, founder21 August 20266 min

The top strip

Open exposure, exceptions by severity, service level and inventory value against target.

The exception list

Ranked by $ exposure. Each row: what, where, when it hits and how much.

The detail panel

The chain from cause to consequence, the evidence, and the recommended action with alternatives.

Acting

Approve, adjust or reject. Assign an owner. The decision is logged and the outcome tracked.

Run the Risk, every week.

One supply-chain shock, decoded in numbers, and what a data-driven plant does about it.

A container terminal at night

Supply chain audit

See where your supply chain is exposed.

A 20-minute call and two file exports: stock by item and open orders. You see the inventory and order value exposed. No integration, no savings estimate, and an NDA if you need one.