Supply-chain terms, defined plainly.

ABC / XYZ analysis
Segmentation of items by value contribution (ABC) and demand variability (XYZ), used to set differentiated policies.
Bias (forecast)
The tendency of a forecast to be consistently above or below actual demand.
Bill of materials (BOM)
The structured list of components and quantities required to make one unit of a product.
Cash-to-cash cycle
Days between paying suppliers and collecting from customers: DIO + DSO − DPO.
Chase list
The short list of open purchase orders a buyer follows up today. Ranked by days of cover, it puts first the late orders that would leave a part short before they arrive.
Control tower
A layer that consolidates supply chain data across systems to provide visibility, detect exceptions and support decisions.
Cover (days of)
How many days current inventory will last at expected demand.
Days inventory outstanding (DIO)
Average inventory divided by cost of goods sold, times days in the period.
Excess inventory
Stock above the level needed to meet expected demand plus safety stock over a defined horizon.
Expedite
Any premium action to accelerate supply: faster freight, overtime, spot purchase.
FEFO
First-expired, first-out: stock rotation by expiry date, common in food and pharma.
Fill rate
Share of demand fulfilled from stock at first attempt, by line, unit or value.
Forecast value added (FVA)
The improvement a forecasting step delivers over a naïve baseline.
Lead time
Time between placing an order and receiving it. Its variability matters as much as its average.
Lead-time drift
The gap between the lead time set in the ERP and the lead time a supplier actually quotes or delivers. Reorder points set on the old lead time trigger orders too late.
MOQ
Minimum order quantity set by a supplier.
MRP
Material requirements planning: calculates what to buy or make, and when, from demand and BOMs.
Obsolete stock
Inventory with no expected future demand.
OTIF
On time, in full: share of orders delivered on the promised date with the complete quantity.
Past-due purchase order
An open purchase order whose promised date has passed without a full receipt. Its urgency depends on stock cover, not on how many days late it is.
Promised date
The delivery date the supplier confirmed for a purchase order line. Once it has passed, it is no longer a reliable arrival date; a blank promised date means the arrival is unknown.
Reorder point
Stock level that triggers replenishment: demand over lead time plus safety stock.
S&OP
Sales and operations planning: monthly process aligning demand, supply and finance plans.
Safety stock
Buffer inventory held to absorb variability in demand and lead time.
Service level
Probability of not stocking out during a replenishment cycle (cycle service level), or fill rate.
Shortage risk
A part whose usable stock will run out before the next open order for it arrives, or whose next arrival is unknown while cover is short.
Single source
A material with only one qualified supplier.
Supply chain audit (WERISCO)
WERISCO's starting point: a company sends two file exports it already runs, stock by item and open purchase orders, and a 20-minute call shows the result on its own data: the inventory and order value exposed. No integration, no savings estimate, NDA available.
TMS
Transportation management system: plans, executes and settles freight.
Value above target
The inventory value held above a company's own target stock levels, item by item. It is a value held, not a saving, and it depends on how the targets were set.
wMAPE
Weighted mean absolute percentage error: total absolute error divided by total actual demand.
WMS
Warehouse management system: controls locations, receipts, picking and shipping.
Working capital
Current assets minus current liabilities; in operations, driven mainly by inventory, receivables and payables.