Skip to content

For the Manufacturing Director

Know which parts will be short before the kit is incomplete.

The parts that will be short, before the line finds out.

What keeps you awake

The shop floor finds out about shortages when the kit is incomplete. By then, the line is set up, the operators are there and the order can't run.

What data you need
Stock by item and site · Usage over the last 4 to 12 weeks · Open purchase orders with promised dates · Supplier lead times
What WERISCO detects
Parts that will run out before their order arrives · Late orders that stock still covers · Reorder points set for outdated lead times
What you can decide
Sequence changes · Order release timing · Shift and overtime planning

Your Monday with WERISCO

The parts that will be short before their next order arrives, ranked by days of cover, so you can adjust the schedule before the line is set up.

Planning · real product

What it's worth

  • Missing kits

    Short parts seen days ahead

  • Expedites

    Only on the parts that will run out

  • Planning

    Lead times that match what suppliers quote

KPIs · Parts below reorder point · Days of cover · Late POs on short parts · Lead-time drift

A container terminal at night

Supply chain audit

See where your supply chain is exposed.

A 20-minute call and two file exports: stock by item and open orders. You see the inventory and order value exposed. No integration, no savings estimate, and an NDA if you need one.